- Overview
- Product Description
- Detailed Photos
- Company Profile
Basic Info.
Model NO.
304, 304L, 316L, 321, 310S, 316Ti, 2205, 2507
Surface Treatment
Polished
Standard Specifications
ASTM A213
Steel Grades
Q235/275/355
Main Process
Cold-Formed Seamless
Unit Leagth
5800mm-12000mm
Annual Capacity
120000 Metric Tons
Section Shape
Round
Customization
Available
Quality
High Quality
Application
Electronics, Industrial, Food, Boiler
Ends
Plain Ends
Products
Seamless Stainless Steel Tube Boiler Tubing for Th
Delivery
7-35 Days
Surface
Pickled, Bright Annealed, Polished
Number
Customed
Used
Pipeline Transport, Boiler Pipe, Hydraulic/Automob
Transport Package
Seaworthy Package
Specification
0.8mm-25mm
Trademark
EZ Steel
Origin
China
HS Code
73043110
Production Capacity
500000/Year
Product Description
Seamless Stainless Steel Tube Boiler Tubing for Thermal Power Station
Commodity: | 316L Stainless Seamless Pipe | ||
Diameter: | 6mm~860mm | ||
Wall Thickness: | 0.5mm~80mm | ||
Length: | Any length between 1~15 meters, will be customized | ||
Standard: | ASME SA213, A312, A269, A688, A789, EN 10216-5 etc. | ||
Surface: | Pickled surface, or bright annealed surface, will be customized | ||
Other Materials: | 304, 304L, 316, 317, 317L, 321, 321H, 310, 2205, s31803, s32750, s32760 | ||
Delivery time: | 15~25 days upon receipt PO, depends on q'ty | ||
Package | Various packages depends on wall thickness & Length ( See below picture ) a) Hexagonal bundles b) Iron boxes c) Good quality plywood boxes d) Good quality wooden boxes e) Customized package | ||
Application: | High-pressure steam boiler, Heat exchanger, liquid-transportation, Condensator, electric power, auto parts and chemical industry. Power plant. | ||
Product quality: | First quality. |
Q: How many days can you deliver after confirmed the order?
A: For stock: within 5-7 days;
For customized product: around 30 days;
For special sizes: subject to negotiation.
Q: How does your company do quality control?
A: ISO 9001:2015 certified;
Product certificate as per EN10204 3.1 or 3.2 as per customer's request.
Q: Can I have a factory-visit?
A: Surely. All customers are welcome to visit us in China.
Q: Can I have a trial order?
A: Of course, it is an honor for us to have the opportunity to show our quality and service.
Business Type: | Manufacturer/Factory | |
Main Products: | Carbon Steel Pipe , Stainless Steel Pipe , Copper Nickel Tube , Heat Exchanger Tube , Boiler ... | |
Registered Capital: | 2000000 RMB | |
Plant Area: | >2000 square meters | |
Management System Certification: | ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, ANSI/ESD | |
Average Lead Time: | Peak Season Lead Time: 1-3 months Off Season Lead Time: within 15 workdays |
SGS Serial NO. : | QIP-ASI199413 Report Verification |
The company has continuously introduced the world advanced manufacturing equipment and now is able to produce welded and seamless steel tube, copper tube and nickle alloy tube. We also have our own coating facilities and workshops for further processing. After years of development, EZ STEEL GROUP and the affiliated enterprises have obtained many kinds of domestic and international certifications including ISO 9001 Quality Management System Certification, ISO14000 Environment Management System Certification, CE, License for Manufacture of Pressure Piping in China, etc. The company has obtained good domestic achievements and is the nominated supplier of CNPC, SINOPEC and CNOOC. The product are exported to Southeast Asia, the Middle East and Africa, Europe, Australia, North and Latin Americas via trade companies, and are widely used in pipeline works, foundation works, steel structure works, boiler and condenser fabrication, oil refinery plant, power plant, sugar-making plant, ship-building and offshore construction projects etc.
Holding the concept of First-class Brand, First-class Service, First-class Value, EZ STEEL GROUP is aiming to build up a win-win enterprise platform for both our customers and employees.