38X19mm Aluminium Rectangular Tube Aluminum Square Tubing

Shop 38X19mm Aluminium Rectangular Tube Aluminum Square Tubing from our factory. High quality and durable products for all your construction needs.
Request a Quote

PRODUCTS DETAILS

  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
KTF381909A
Alloy
Alloy
Temper
T3 - T8
Weight
0.269kg/M
Color
Silver White
Film
Average 10 Microns
Wall Thickness
0.9mm
Transport Package
Heat Shrinkable Film, Rolled Craft Paper
Specification
19x38mm
Trademark
KEMET
Origin
China
HS Code
7604210000
Production Capacity
8000000kg/Year

Product Description

Product Description

Aluminium round tube can be used to make the structure of simple houses, be cooling parts of equipments, drain water and some air blowing parts,etc.
Some of them require high precision and some require functions. You can buy what you want to buy from our factory and get the guaranteed quality.
The surface treatments are anodized, powder coated, wood grain transfer, fluorocarbon spray, mill finished, electrophoresis, polished,etc. Wide application range will make them more popular in building construction field.

Detailed Photos

38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing38X19mm Aluminium Rectangular Tube Aluminum Square Tubing

1  How many surface treatments can you make?
We can make anodized,sandblasting, electrophoresis, extinction, powder coated, water-based paint, fluorocarbon painting spray(two layers, three layers, four layers), powder-coat based wood grain transfer, electrophoresis based wood grain transfer, mill finished, brush anodized, polished.

2  How could you guarantee the quality?
Firstly, we produce products by ISO 9001 standard strictly and our workers will pick out the bad products. Secondly, our quality directors will check it again. Thirdly, we will use the best package ways to protect the surface of products and make sure they will not change shape. Fourthly, once some accidents happened caused by ours, we have quality feedback system, we will give best solutions for our customers.

3  Can you do OEM and ODM?
Yes, we can make products for your brands but your brands can not break the rights of other customers and we also will keep secrets for our customers, also we require deposit for brands making and we will give back after finish the goods, the deposit will be returned.

4  Can you make the free mould/tooling?
It depends on the quantity, 1. For example, if your goods is the small profile(the section is below 30x30mm), you just buy 5~10 tons one time and the mould/tooling cost is free; if your quantity of one kind can't reach to 5 tons one time, then, when the quantity reaches to 5 tons, we will refund the mould/tooling cost for you. If your profile is beyond 30x30, the the mould cost will be refunded requiring more than 5tons, may be 10 or 30 tons or 100 tons, please consult with our sales managers.

5  What kind of policies will you support for customers?
We give the reasonable overdraft time, if you have hard finance in some time, we can specially give the item of D/P or D/A 30days, different situations will be treated with different conditions.

6  If i place orders first time, what should i provide?
If you place orders that we don't have mould/tooling, then we need the samples or CAD drawings to make new moulds/toolings; for colors, you also can send us the samples or the color number if you know that. Also tell us the package details.

7  How long will you delivery goods?
For making new mould, we generally cost about 7~12 days (for different sizes), after making new moulds, we will test and repair moulds/toolings, this process will cost 3~5 days; then the products manufacturing will cost about 15~25days based on different quantity levels. So after making new moulds, the shortest time is 15~17days(workers will have two days holiday for every month) to delivery goods.

8  If i pay for deposit and i don't want to buy, how to deal with?
For the mould cost, we will not refund it and if the products has been produced, then the deposit will not be returned, if the goods are ready to produced and the material(such as the customized powder coated, wood grain paper, brand films, or other materials) also prepared, then the deposit will not be refunded; if the order has not be arranged and materials are not ready, then we can returned the deposit with the reasonable currency exchange rate.
 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours